October 18th Construction Update
Summary Of Activities:
SITEWORK/MOBILIZE CONSTRUCTION SITE
- Curb cut at construction entrance (10/22)
- Tree removal (10/27)
- Strip and dispose of topsoil (11/3)
- Layout for blasting (11/17)
- Start blasting (11/19)