Summary Of Activities:

SITEWORK/MOBILIZE CONSTRUCTION SITE

- Curb cut at construction entrance (10/22)

- Tree removal (10/27)

- Strip and dispose of topsoil (11/3)

- Layout for blasting (11/17)

- Start blasting (11/19)